• CanadaPlus@lemmy.sdf.org
      link
      fedilink
      English
      arrow-up
      0
      ·
      3 months ago

      Yup, it needs to dry fast enough for the next layer, but not so fast it makes a clog, and it needs to flow in just the right way you can predictably extrude a layer on. And be cheap-ish.

      Of course, you still have to add a lot of non-structural components, like the other user said, and if it needs to take significant loads you also need to add reinforcement somehow, since concrete is weak under tension.

      • bluGill@fedia.io
        link
        fedilink
        arrow-up
        0
        ·
        3 months ago

        You also need to add insulation and then do something to hide the ugly layer lines.