• magnetosphere@fedia.io
    link
    fedilink
    arrow-up
    3
    ·
    2 days ago

    That bridge is for a train track. Raising it would be a large, expensive, time consuming project. If you’re changing the grade of a train track, it will need to be long, gradual, and smooth.