Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

  • lemmydividebyzero@reddthat.com
    link
    fedilink
    English
    arrow-up
    3
    arrow-down
    2
    ·
    2 days ago

    You kind of missed the point of my post. I don’t want to get rid of nuclear. I just don’t want to build new NPPs, when there is a far cheaper alternative.

    BTW: How many people have died because of photovoltaic that is constructed on the ground on large fields? Probably 0… If you want to minimize death, this is the way to go.

    • Valmond@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      arrow-down
      1
      ·
      2 days ago

      Okay fair point, and yes we don’t need more nuclear in the west I think, but more more more renewables. That said it’s better than coal & gas & oil so if we can’t make renewables fast enough then more nuclear is better (unlikely but possible) IMO.

      For the death tolls on renewables, oh my you you sweet summer child are you in for a rude awakening.

      I’m still for massive augmentation of renewables ofc.